CHAPTER
TWO: THE
ROLE AND
TRAINING OF
A PETROPHYSICIST
Table
Of Contents

2.00 Introduction to This Chapter
2.01 The Role of the Petrophysicist
2.02 What Does A Petrophysicist Really Do?
2.03 Field Procedures
2.04 Log Quality Control Policy
2.05 Typical Quality Control Problems
2.06 Writing Reports
2.07 Log Analysis Methods
2.08 Petrophysics in Integrated Projects New
2.09 Petrophysical Data Gathering
2.10 Petrophysical Data Processing
2.11 Quality Control of Analysis Results
2.12 Is Petrophysics The Career For You?
2.13 The Training of a Petrophysicist
2.14 In Conclusion
2.15 Exercises For Chapter Two
2.16 Bibliography for Chapter Two
Click
here to go to NEXT CHAPTER
Publication
History: This Chapter was originally published as Chapter Two
of the Log Analysis Handbook, Pennwell 1986. Sections 2.08 through
2.10 were added, Section 2.11 was revised, and the balance updated
for this eText edition February 2001.
CHAPTER
TWO: THE
ROLE AND
TRAINING OF
A PETROPHYSICIST
2.00
Introduction to This Chapter
Petrophysicists offer services in the areas of well logging supervision,
log analysis and interpretation, computer analysis of logs, seismic
modeling, synthetic seismograms, and reconciliations of log data
with geological, geophysical and exploration prospects, field
studies and simulations, reserves estimates, and submissions to
regulatory agencies. These services are essential functions in
modern oil and gas companies and cannot be accomplished without
input from trained petrophysicists. The financial health and long-term
success of a company depends on the central role of the petrophysicist
in all aspects of the company’s exploration and development
activities.
In
the last twenty years, some changes in emphasis on the role and
training of a log analyst have taken place. Integration of data
from all the geosciences into the log analysis results (and vice-versa),
the more common use of the title "Petrophysicist" instead
of "Log Analyst", and the pervasive influence of the
desktop computer are obvious to all who work in the field of petrophysics.
To newcomers, these shifts may appear obvious but they have occurred
slowly, so training and perception of the role have not always
kept pace. We will try to fix that problem in this Chapter.
There
is no formal degree given at any university for either log analyst
or petrophysicist, although one may obtain a Masters or Doctors
degree with petrophysics as the central research theme. This web
site will not replace a formal science or engineering education,
but it will go far beyond the petrophysics content at most University
curricula.
Most
of the information we need from logs must be gained by data analysis,
since few logs measure directly any of the things we really want
to know. Thus the role of the log analyst was born. In the last
10 to 15 years, the log analyst job description has been broadened
to include assessment of the other geoscience data sets to enhance
the reservoir analysis. In this environment, the petrophysicist
job title is appropriate.
A
petrophysicist is at once a scientist, a magician, and a diplomat.
The analyst has extensive scientific knowledge of geology, geophysics,
thermodynamics, mechanics, atomic physics, sedimentology, petrology,
mathematics, chemistry, electrical and electronic engineering,
petroleum economics, and in the near future, probably astronomy
and comparative planetology. After all, the largest accumulations
of natural gas (methane) are in outer space.
The
synthesis of these subjects requires a bit of magic, supplied
by the analyst's imagination, inspiration, experience, and inventiveness
(usually called hunches or "gut feel"). Much of our
work is based on empirical relationships between observed facts,
some of which can subsequently be proven rigorously; others cannot
yet be proved. The hunches provide the link between the known
and the unknown.
Diplomacy
is needed at several levels. At the well site, you are often dealing
with many people, not under your control, who have their own opinions
and priorities (and getting good log data or answers is seldom
one of their priorities). In the office you will present opinions
to people who know absolutely nothing about any of the sciences
mentioned above, or who may know a great deal more than you do
in a particular science, or who may not yet trust your judgment
or hunches.
It's
a tough tightrope to walk on a windy day.
2.01
The Role of the Petrophysicist
Log analysis often requires some numerical exercise, especially
with the use of computers and calculators so common, but interpretation
and judgment calls are required from the analyst as well. The
job is not just to do the algebra, but, to decide what the numbers
really mean. Will the well produce oil, or gas, or water, how
much, and for how long?
Mr.
G. E. Dawson-Grove, a well-known consulting petrophysicist,
likens the role of the log analyst to that of the "spider
in the web." He claims that the petrophysicist plays a "vital,
central, potentially controlling position." The range of
his or her influence is wider than any other disicipline within
the oil industry, with the possible exception of the financial
wizard. To be successful in this role, however, the analyst has
to realize the importance and potentially powerful position he
or she is in, and be able to sell ideas to co-workers and management.
FIGURE
2.00: D-G’s Spider In The Web
Because of the multi-discipline approach required, the analyst
must maintain a web of communication with many seemingly unrelated
functions within the organization. The analyst must be sensitive
to the vibrations coming along each strand of the network and
respond accordingly. That response might be in the realm of geophysics,
geology, reservoir engineering, petroleum economics, secondary
or tertiary recovery engineering, or corporate management.
"D-G" goes on to explain that we should not consider
a response which suggests the minimum effort needed to get an
answer, but should emphasize the maximum contribution that a petrophysicist
(and all the available tools and data sets) could make to a company's
success. We must convince management that a "full evaluation"
is necessary, not just the minimum. There are selfish reasons
as well as altruistic ones to pursue this route. You will look
good if your company's success ratio looks good - especially if
you can show how your contribution helped.
The
author's proprietary software package is called META/LOG. "Meta"
means "beyond" and the software goes well beyond log
analysis, as it contains modules for core analysis, drill stem
test analysis, production history analysis, and cash flow prediction.
META has also come to stand for Maximum Evaluation - Total Analysis.
The fact that META/LOG is an anagram for LOG/MATE, the author's
first commercial software package, is a genuine coincidence and
was pointed out by a client several years after the name was chosen.
Mr.
Dawson-Grove prefers the term "petrophysicist" to describe
what this book calls "the analyst". Petrophysics refers
to the study of rocks (or measurements on rocks) but it is clear
from Mr. Dawson-Grove's own words, quoted above, that the analyst
has far more to consider than mere rocks. I personally prefer
the term "applied petrophysics" to replace the term
"log analysis", and to distinguish between academic
(theoretical) or laboratory petrophysics (core analysis).
We
should also distinguish between a logging engineer, who operates
the instruments that record the logs, and the petrophysicist,
who figures out what the logs really mean. The logging engineer
very often is a recent graduate with no petroleum or business
experience. Obviously they must gain this experience on the job
to be effective log analysts. It is unfortunate that not all logging
engineers have gained the necessary experience, or are not suited
to the analyst's role, but are often obligated by their employer
and their customers to analyze logs before they are competent
in this field.
A
good knowledge of the logging engineer's job is a valuable asset
for the analyst. Much of the material in this handbook is presented
with this in mind.
2.02
What Does a Petrophysicist Really Do?
In this Chapter, the petrophysicist is the person doing the analysis.
The client is the person or corporation who wants the work done.
The analyst may be an employee of, or a consultant to, the client.
Petrophysicists
offer services in the areas of well logging supervision, log analysis
and interpretation, computer analysis of logs, seismic modeling,
synthetic seismograms, and reconciliations of log data with geological,
geophysical and exploration prospects, field studies and simulations,
reserves estimates, and submissions to regulatory agencies. These
services are essential functions in modern oil and gas companies
and cannot be accomplished without input from trained petrophysicists.
The financial health and long-term success of a company depends
on the central role of the petrophysicist in all aspects of the
company’s exploration and development activities.
A
good petrophysicist will have many years experience in well logging
and related geophysical, geological, engineering, and computer
applications. Unfortunately, the job is often given to the least
experienced and youngest staff. With luck, there will be a guru
down the hall who can offer advice. With all the layoffs and mergers
in the last 15 years, a lot of gurus are consultants and are no
longer available “down the hall”.
In
the Office
- the Petrophysicist will:
1.
Design optimum logging programs, considering the objective
formations, fluid characteristics, and company budget.
2. Supervise computer analysis of new and old wells
to obtain maximum reconcilliation of log data with cores,
drill stem tests, and geological sample descriptions,
using an in house system or commercial service bureaus
as required.
3. Control quality and turnaround time of computer analysis
jobs
4. Interpret dipmeter, production, and fracture identification
logs.
5. Interpret logs, by hand or by programmable calculator,
when computer analysis is impossible or inappropriate.
6. Co-ordinate log analysis for integration into reservoir
evaluations, reservoir model studies, or geophysical
prospects.
7. Undertake special research or in-depth studies of
particular problems, such as over-pressure, variable
log evaluation parameters, or exotic minerals.
8. Evaluate logs for ground water, coal, potash, salt,
tar sands, uranium, or other valuable resources.
9. Prepare and present log evaluation courses for general
or detailed study by oil company personnel.
10. Prepare detailed seismic models from well logs in
conjunction with stratigraphic or structural assumptions,
and create synthetic seismograms for each model using
a computerized system. |
|
Using
Computers
- the petrophysicist will perform or supervise:
1.
Digitizer, magnetic tape, or keyboard data entry of
raw log data.
2. Edit data (re-scale, depth shift, point edit).
3. Enter and edit analysis parameters.
4. Permanent storage of data on disc or tape.
5. Prepare neat, printed results with input data and
computed data.
6. Prepare porosity and hydrocarbon volume accumulations
with or without cutoffs – detail or summary listings.
7. Handle metric or English units logs with equal ease.
8. Provide many different log analysis methods, with
user defined options, the choices depending on data
quality and formation characteristics.
9. Prepare four or three dimensional crossplots with
X, Y, Z and W axes and scales defined by the user.
10. Display versatile and highly selective plots of
results or input data or both, in colour.
11. Input, edit, averaging, printout and plotting of
core and mud log data and calibration of core and mud
log data with log curve data.
12. Create reservoir summaries sorted by zone, project
and cutoff levels.
13. Provide seismic data results (e.g. acoustic impedance,
velocity, integrated time or density) printed or plotted.
14. Prepare seismic model studies, including effect
of hydrocarbons and changing lithology.
15. Prepare synthetic seismograms on original or modeled
data, with variable wavelet type and frequency, and
create synthetic seismic section.
16. Provide fast turnaround, typically two hours for
one zone less than 300 feet thick. (Less time per zone
can be spent for multi-well or multi-zone projects).
Time will depend on log quality and type, availability
of other data, and whether or not that data is contradictory. |
|
2.03
Field Procedures
Field supervision of logging jobs and log analysis performed in
the field are two important functions and tremendous training,
both technical and emotional, for a petrophysicist.
In
the Field
- the Petrophysicist will:
1.
Get to the rig on time.
2. Prepare for the job by studying prior work before
arrival, and by studying the sample description, DST
reports, core descriptions and well history after arrival.
3. Discuss well history and results to date with wellsite
geologist and drilling engineer.
4. Prepare instructions for the logging engineer as
thoroughly as possible, based on logging program in
well prognosis.
5. Discuss job details with logging engineer, explain
your special requirements, why you are there, and what
you expect from him.
6. Monitor progress continually; check films, repeats,
scales, calibrations, logging speeds, depth control,
keep records of tool failures, logging times, hole problems.
Do not rely solely on the logging engineer's data, opinions,
or service order information.
7. Monitor logistics, tool movements, hot-shots, time
commitments (aircraft, land sales, etc.).
8. Keep wellsite geologist, wellsite engineer, and drilling
supervisor informed on progress and problems, and keep
logging engineer informed of changing requirements and
time commitments.
9. Do log analysis based on all available data. Recommend
interesting intervals for testing, recommend additional
logs if analysis or log quality demands more data.
10. Report log analysis by radio or phone to oil company
home office, report progress and next moves to your
office via oil company contact or directly if radio
or phone time is available.
11. Monitor re-plays, film assembly, and field printing
of logs.
12. Write final reports, fill in all appropriate quality
control forms, and log analysis report forms.
13. Collect all films, tapes, and prints. Package for
hand delivery to client office, or arrange for air or
courier delivery of logs to oil company office (or to
partners as requested). No prints are to be left with
logging engineer unless authorized by the client.
14. Monitor and recommend parameters for computerized
field interpretations by the service company, if this
has been requested.
15. Set up zones for computer analysis. If required
make an extra set of logs for this, to be returned to
client with final computerized analysis.
16. Go to next job (or home), submit reports to your
office for typing, or finish report and email to office.
17. Check final typed report and deliver to client personally
(if possible).
18. Request log repairs, in writing, from service company,
or relay requirements to your office.
19. Request service company computed log (if required),
Supply parameters and quality control intermediate results
(or delegate to your office staff).
20. Supply copy of quality control report to service
company sales engineer and to service company location
manager.
21. Follow up results and recommendations with client.
22. Check logging contractor's service order for correct
and complete details. If you have signing authority,
sign service order and note discrepancies or disputes
for future handling.
23. Review final invoice from service company. Compare
to your own record of the job and request corrections
or approve for payment. |
|
See
Figure 2.01 for an over-view of how the data and information flows
through to the end-user from the field.

FIGURE 2.01: Data communication flow chart
2.04
Log Quality Control Policy
As a petrophysicist, you have the highest quality standards in
the industry - you want perfect logs. However, this is seldom
achieved. The philosophy on accepting or rejecting a log (and
having it re-run) in the field is based on the following concepts:
CRAIN’S LOG QUALITY CONTROL POLICY
| 1.
If the problem (e.g. wrong scale, sonde error, off depth)
can be fixed by re-play on a computerized truck, re-play
the log, and label the heading accordingly. |
| 2.
If the problem can be fixed by a re-play in the service
company's computer center, label field prints accordingly
and arrange for the re-play in the office. |
| 3.
If the problem can be overcome by use of another (redundant)
log curve (e.g. GR, caliper) arrange to re-play log
with this curve. Label the heading accordingly. |
| 4.
If the problem is a function of hole size or condition,
and sufficient repeat sections indicate that no improvement
can be made, do not re-run further. Label the heading
accordingly. |
| 5.
If log does not repeat, shifts, does not compare with
offsets, or contains unexplainable anomalies (e.g. conductive
spikes, very high density), or cannot be replayed to
be corrected, re-run with a different set of tools (all
components should be changed). |
| 6.
If a log cannot be re-run when requested (due to lack
of tools, hole condition, client request), note this
on the log heading and in your report. |
|
All
faults (tool failures and log problems) should be noted in your
report, even if they do not cause lost rig time or invalidate
the log. This information is used to point out potential areas
of concern, and provide historical information to track service
company and logging engineer performance. Reporting forms to keep
track of problems, rig activity, and log quality can be found
in Appendix One of this handbook.
While
it is your duty and desire to obtain the best logs possible for
your clients, this objective may create a conflict with the service
company doing the logging. You are not in a position to insist
on unreasonable or impossible demands, but you are expected to
mediate diplomatically in such a way as to ensure that a reasonable
effort is made to achieve useable, valid logs. Bear in mind that
"the client" is the oil company (your boss) and not
the service company.
You
do not have the full authority of the client at your disposal.
All significant decisions which may involve the safety of the
well, the time and cost of the job, and the need to continue logging
in the face of bad hole conditions, must be discussed with the
client. No attempt should be made to usurp the authority of the
drilling supervisor or wellsite geologist, but you are expected
to make well reasoned presentations of the current situation,
the possible alternatives, and the expected outcome of each choice
to these people.
2.05
Typical Quality Control Problems
A typical set of log quality problems is listed in the following
pages. All logs were accepted as noted due to the cost of rig
time and the redundancy of the data. However, many of the problems
could have been fixed with more care by the logging engineer,
and many were fixed before final prints were made. The ability
to track problems across several jobs is evident and its importance
cannot be over-emphasized.
The
logs were run using analog equipment prior to the introduction
of computerized equipment. Most of the problems listed can still
occur on computerized trucks.
QC
Report: Well "A" - Run One - 13 January 19XX
- logged by Engineer "X"
1.
Depth measuring wheel would not drive while running
dual induction - repaired - one half hour lost rig time.
2. Dual induction panel failure - replaced - one hour
lost.
3. Lettering and grid lines burnt off all log prints,
printer needs repairs.
4. Medium induction curve missing on 1:600 film - need
to replay log.
5. Deep induction curve shifted on repeat compared to
main pass - should have had additional repeat.
6. SP calibrate four divisions instead of five - can
be scaled correctly on replay.
7. Sonic log shift and sensitivity problem 1229m to
TD, should have been repeated or re-logged.
8. Density neutron log film jam 1365m - should have
been re-logged or replayed.
9. Density log calibration drifted (2590 - 2580Kg/m3)
on calibrate (log position) - out of tolerance for this
log.
10. Neutron log calibration steps out of tolerance on
high end.
11. Dipmeter calibrations missing.
12. GR missing on dual induction log - was requested. |
QC
Report: Well "A" - Run Two - 18 February 19XX
- logged by Engineer "Y"
1.
Depth measuring errors - one and one half hours lost.
(see run one)
2. Density neutron recalibrated - one hour lost.
3. Dipmeter - unsynced after hitting bridge too hard.
Four and one half hours lost – not charged against
service company.
4. Printer still burning off lines on all prints - after
request to repair or replace - see run one.
5. Dual induction log depths wrong due to depth measuring
problem not repaired in field - needs to be replayed.
6. Dual induction before survey calibrations missing
- should have been re-run.
7. Shallow resistivity curve missing on repeat section
- needs to be re-played.
8. Dual induction after survey calibrations out of tolerance
- should have been relogged.
9. Caliper on sonic log recorded off depth - needs to
be replayed.
10. Sonic log galvonometer sticking - needs to be replayed.
11. Excessive cycle skips 2140 - 2210 - should have
been relogged.
12. Sonic depth errors due to depth measuring problem
- needs to be replayed.
13. Density neutron scale change not noted - fixed on
final prints.
14. Optical shift to sandstone scale not noted - fixed
on final prints.
15. Several film jams (not at critical depths) - should
have been relogged.
16. Some density calibration steps below tolerance.
17. Sidewall core gun shot 24, lost 6, misfired 5, recovered
13 - only fair performance.
18. Repeat formation tester: 14 attempts, only 2 pressures
due to seat failure-pulled tool to add 2 inch backup,
tried 19 more sets of which 8 were successful seats
- no lost time charged to service company. |
QC
Report: Well "B" - Run One - 04 March 19XX - logged
by Engineer "X"
1.
Heading errors - ground level is sea floor not 0.0 m
as shown, casing size missing - fixed on final prints.
2. Sonic caliper scale not shown - fixed on final prints.
3. Sonic caliper calibrated to 225mm instead of 203mm
- needs replay to correct.
4. Density neutron caliper scale wrong on insert, OK
on heading - fixed on final prints.
5. Calibration scale not noted - fixed on final prints.
6. Directional survey all scales missing - fixed on
final prints. |
QC
Report: Well "C" - Run One - 03 March 19XX - logged
by Engineer "Z"
1.
Dual induction power failure - one hour lost rig time.
2. Dual induction master calibration unreadable on
prints and out of tolerance - should have been fixed.
3. No GR on dual induction - should be replayed from
sonic log.
QC Report Well "C" - Run Two - 06 April
l9XX - logged by Engineer "W"
1. Dual induction - four hours lost rig time due to
GR dead galvo, depth measuring system not working,
sonde error set wrong.
2. Dipmeter lost sync - excessive drift - not noticed
by engineer, log re-run - seven and one half hours
lost rig time.
3. Dual induction linear grid on logarithmic scale
1351 - 1613 meters - needs to be replayed.
4. Dual induction film jam 1375 - needs to be replayed.
5. Dual induction - no GR calibrations - should have
been relogged.
6. Dual induction - no labels on after survey calibrations
- fixed on final print.
7. Sonic log - integration wrong on portions of log
that were re-run due to excessive cycle skipping on
first pass - no lost time recorded for re-runs but
some was incurred.
8. Sonic log integration wrong (differently) on main
pass, also needs to be replayed.
9. Sonic caliper scale wrong - fixed on final print.
10. Neutron master calibration too faint to read.
11. Directional survey deviation curve incorrect -
should have been relogged.
12. Sonic amplitude log shown in feet not meters.
13. Wavetrain film black, muddy - should have been
relogged.
14. Sonic amplitude calibrations missing before survey
- no GR calibrations - should have been relogged
|
QC
Report: Well "A" - Run Three - 09 April 19XX -
logged by Engineer "W" and "Z"
1.
Dipmeter cartridge failure - 4 hours lost rig time.
2. Sonic amplitude - missed logging interval - 1/2
hour lost rig time.
3. Deep induction - 1 meter deep to other DIL curves
- should be replayed
.4. Dual induction master calibration missing.
5. GR missing on dual induction - should be replayed
from sonic log.
6. Printer burning off lines again.
7. Sonic caliper off depth and invalid - should be
replayed from density log.
8. Sonic GR calibrations missing - should have been
relogged.
9. Density master calibrations unreadable.
10. Density calibration before and after on different
scales, both different than log – no scales
on calibrations - should have been re-done.
11. Logs not run into casing 30m as requested.
|
QC
Report: Well "B" - Run Three - 06 April 19XX -
logged by Engineer "Z"
1.
Dual induction line leak, 1 hour lost rig time (same
as on Run Two).
2. Dipmeter electrical failure and excessive gyro
drift - 4 hours lost.
3. SFL curve coded wrong (dashed instead of solid)
- should be replayed.
4. Dual induction master calibration missing.
5. GR missing on dual induction - should be replayed
from sonic log.
6. Sonic GR showering - should have been relogged.
7. Sonic caliper invalid (very high compared to density)
- should be replayed from density.
8. Sonic repeat section off depth - should have been
relogged.
9. Sonic calibrations far below tolerance - should
have been relogged.
10. GR calibrations missing on sonic - should have
been relogged.
11. Density master calibrations unreadable - same
as previous runs.
12. Density caliper reading low in casing.
13. Neutron ratio scale on master calibrations missing.
14. Deviation goes off scale - should have changed
scales (1400m).
15. Dipmeter most calibrations missing - should have
been re-done.
16. Sonic amplitude calibrations missing - should
have been re-done.
17. Amplitude does not repeat - should have been relogged.
18. Wavetrain film broken, black background, dirty
- should have been relogged.
19. Wavetrain section missed 1609 - 1676 - should
have been relogged.20. Core gun shot 24, recovered
24, 10 were empty. |
|
Most
of these problems are immediately obvious even to a relatively
inexperienced logging engineer, his manager, and his client -
namely you. Rig cost, the pressure of the next job, the hostile,
remote environment and carelessness all contribute to this lengthy
list, which is considered normal for the area. What would you
do when faced with these problems?
A
service company salesman once told me that I was “worse
than Shell Oil when it came to log quality control. I took this
as a compliment, although it probably wasn’t meant that
way!
2.06
Writing Reports
You
will need blank forms or a computer and appropriate software to
write your log analysis report. I currently use a spreadsheet
and word processor off the shelf, but corporate policy may force
you to use more cumbersome packages. The commentary should be
written uniquely for each job, to cover the who, why, what, when,
where, results, and recommendations. Some “copy and paste”
is allowed but try to provide some original insights into each
job. While several separate reports are illustrated elsewhere
in this Handbook, the pages should be combined in any reasonable
way to form one composite report.
Your
name is on the report, be proud of it. Log analysis reports hang
around in well files for years. Don't leave a shoddy product that
will come back to haunt you.
2.07
Log Analysis Methods
Log analysts should use fairly standard log analysis methods.
such as those presented in this handbook. These are based on density
neutron crossplot (sonic neutron or sonic density if appropriate)
or shale corrected sonic (or shale corrected density or shale
corrected neutron) for porosity, and the Simandoux water saturation
equation, or some other acceptable shale corrected saturation
equation.
These
results can be obtained by any method you like - chart book, hand
calculator, programmable calculator, or a computer. DO NOT RELY
ENTIRELY ON OTHER PEOPLE'S CALCULATIONS, such as those made at
the wellsite by computerized logging trucks, or other third party
results. Do your own work to check theirs.
Results
should be neatly written in a standard format, and a written commentary
should cover the reasons for the job, your assumptions, and a
reconcilliation of the results with other well data. This should
be typed and filed in the well file or project file, and distributed
to all partners in the well by an appropriate person in the client
company. Spreadsheet and word processor software makes this amazingly
simple.
NEVER
SUBMIT NUMBERS WITHOUT COMMENT - THEY CAN BE MISUNDERSTOOD TOO
EASILY.
Handwritten
reports are usually discarded from well files. Typed or computer
printed results are essential.
Always
include a copy of the General
Terms and Conditions (disclaimer and waiver) with even a handwritten
analysis, if it is given to the client or a client's partner before
the final report is typed. This should be done even if you are
an employee of an oil company, since you want to protect your
employer from any possible legal action brought on by others,
caused by errors or omissions in your recommendations or calculations.
2.08
Petrophysics in Integrated Projects
Note: the next three sections were written in 1993 as the result
of three forensic log analysis projects for the same client. I
call these “Rescue Jobs” because in most forensic
cases, the project can be rescued and both the end user and the
contractor (consulting firm) can be saved from their mutual impasse
without serious loss of face, by interjection of an independent
third party who mediates and proposes a rational solution. The
material was prepared as an instruction manual for the contractor
and as a 10 step how-to-do-it (unpublished) article.
STEP
1: Define the Petrophysical Objectives
We seldom do petrophysical analysis for its own sake – usually
the results are used as input to some other activity, like a well
completion plan, an economic analysis, or a reservoir description
for a full field simulation study.
Clearly
defined petrophysical goals and procedures help assure an efficient,
technically sound result. The primary purpose is to give the petrophysical
team a set of step by step instructions to assist them in project
definition, planning, execution, and quality control. This will
help to reduce errors and duplication of effort, and maximize
project quality. A good plan and procedure keeps expectations
in line with the data type and quality, as well as with budget
and time constraints.

FIGURE 2.02: Petrophysical Cross Section From a Forensic Log
Analysis –
Guess Where the Horizontal Well Was Drilled!
The
petrophysical plan also helps to acquaint management, the client,
and other groups who rely on the petrophysical results, with our
methods and data requirements. Since integration of petrophysical
data with larger projects is one of the important goals, guidelines
on how to handle these relationships are described here.
Petrophysics
is often a step by step procedural process. However, a number
of motherhood statements are understood to be included (eg. thoroughness,
diligence, persistence, quality, resources). Although we all know
that these factors are important, most unhappy clients, blown
budgets, and delayed deadlines are caused by forgetting these
basics.
The
role of project managers and senior managers is also an important
aspect of an integrated project, since their support is crucial
to the success of a project. Inadequate or late disposition of
resources can only be corrected by senior management, no matter
how willing the analytical staff may be.
The
objective of the Petrophysical Phase is to provide an independent
analysis of all producing or prospective reservoir zones seen
in well logs. The project usually requires integration of the
well log analysis with geological, stratigraphic, petrographic,
conventional core, special core, completion, production, and reservoir
engineering data.
STEP
2: Define Who Does What
The petrophysical phase of a project is usually a small to medium
sized portion of a larger project. The usual project phases are:
1.
Geophysical Phase
2. Geological Phase
3. Petrophysical Phase
4. Reservoir Engineering Phase
5. Reservoir Simulation Phase
6. Facilities and Economics Phase
Although
the phases appear to be sequential, there is considerable overlap
and feedback between phases. Careful planning of all phases, and
special attention to the inter-relationships between phases, will
provide the optimum results and minimize costs.
For
example, all Phases require log data, but of different types,
intervals, scales, accuracy, and at different times in the life
of the project. A decision has to be made as to who does the digitizing,
who checks it, and is it done once for all to use, or done as
needed by each group?
Similarly,
Petrophysics requires core porosity vs permeability transforms
and capillary pressure water saturation vs porosity relationships
at an early stage; reservoir engineering needs this data much
later. Should reservoir engineers provide this data to the log
analysts, or vice versa?
The
same questions must be answered with respect to petrographic data,
fluid properties and contacts, geological structure, and other
reservoir description data. All of this data is required by more
than one of the Phases, but at different times.
Once
decisions are made as to who does what, the project manager, and
phase managers, must follow up to be sure the various tasks are
being accomplished correctly and on time, and what other resources
might be needed to help finish.
STEP
3: Plan the Project Integration
Integrated planning will coordinate the tasks of all phases of
the project. Critical path timing can be displayed on PERT charts
(Figure 2.03).

FIGURE 2.03: PERT Chart for Petrophysical Project
Better
definition of resource needs and resource conflicts can be seen
on Gantt charts (Figure 2.04).

FIGURE 2.04: GANTT Chart for Petrophysical Project
Problems
show up even more clearly on a Resource Gantt chart (Figure 2.05).

FIGURE 2.05: Resource GANTT Chart for Petrophysical Project
Although
easy to make, these charts require constant updating, usually
weekly. However, the effort is rewarded by catching resource deficiencies
or conflicts before they proceed too far. The three illustrations
shown above are from an article by my good friend Robert Elphick,
published in SPWLA Log Analyst, Dec 1992.
Additional
entries on the Resource Gantt chart are helpful. For example,
showing the timing of all inputs (source data) and outputs (deliverables)
for a resource will show up conflicts that are not apparent in
the resource allocation bars. The output of one Phase is often
the input to another Phase. Assigning people to a Phase when their
inputs are not available produces nothing but frustration.
While
resources may need re-allocation to overcome some obstacles, this
may incur some penalty due to broken continuity or loss of man-power.
Adding people to a team has diminishing returns, which set in
when a team exceeds 6 or 7 people. Conversely, adding or speeding
up hardware and software usually has immediate, low-cost benefits,
provided of course that these resources are truly tested and ready
for release in a real-world environment.
Regular
meetings of all Phase leaders are needed to keep the various activities
coordinated. These should be short, have an agenda distributed
in advance, and be adjourned promptly when the agenda is exhausted.
Smaller meetings may follow to correct specific problems, but
not all Phase leaders need to be present. If a Phase has a number
of staff, Phase meetings may be needed to assemble progress data
before the formal weekly meetings. Brief written weekly and monthly
progress reports should be distributed to Phase leaders and the
client.
STEP
4: Define the Petrophysical Deliverables
The petrophysical team assists in data gathering, to ensure that
all required data is available at an early stage in the project.
Open
hole logs will be used to determine shale volume, effective porosity,
water saturation, permeability, and (where possible) lithology.
Cased hole log analysis will be performed, as needed, to assist
in determining production characteristics, fluid movements, and
dated fluid contacts. Swept zones, sweep efficiency, and residual
oil saturation in partially depleted reservoirs can often be determined
from modern open and cased hole logs.
Results
will consist of summary tables of pore volume, hydrocarbon pore
volume, flow capacity, average porosity, average water saturation,
average permeability, and net pay after application of cutoffs
and layer depth criteria.
These
results will be used to generate reservoir property maps for estimation
of original oil in place and flow capacity. The maps will be supported
by detailed depth plots and listings of all input and computed
data. Results will be used as input to the Reservoir Engineering
and Reservoir Simulation Phases of the project, and also to assist
in final assessment of mapping performed in the Geological Phase.
Reservoir
zonation is often determined in the Geological Phase, in which
formation tops, stratigraphy, facies, structure, and isopach maps
will be prepared for use in the Petrophysical Phase. Mapping of
petrophysical results and determination of volumetric original
oil in place is usually done as part of the Reservoir Engineering
Phase, but may be delegated to the Geological or Petrophysical
Group.
STEP
5: Define the Resources Required
A technically and economically successful petrophysical analysis
of a large number of wells in any project requires appropriate
application of the following resources:
1.
a petrophysical manager/analyst.
2. one or more trained log analysts.
3. one or more trained log technicians.
4. dedicated computer hardware for each analyst and technician,
capable of fast
processing and plotting.
5. computer software capable of fast, error free computation.
6. trained digitizing staff with digitizing tables and software.
7. a client who can gain access to the required data and deliver
it in a timely manner
8. a work environment that keeps the team intact for the duration
of the project, and in close proximity to each other.
9. sufficient time to perform all data gathering, database building,
data quality control, technical research, data processing, result
verification, data presentation, and reporting
10. a detailed plan that shows all the steps required for completion
and quality control of the above tasks.
11. close integration with other Phases of the project to minimize
duplication of effort and maximize quality of results for the
client.
12. a corporate infrastructure that will quickly rectify any deficiencies
in the application of needed resources.
It
is common to see Resources #1, 2, and 3 combined in one human
brain/body. If timing constraints do not interfere, this approach
gives good results.
Digitizing
(Resource #6) is often done better by the log analysis technician
(Resource #3) because he/she has a vested interest in the quality
of the work. Another option is an out-of-house service bureau
whose primary business is digitizing logs. Quality control of
this function is critical, as all Phases of the project depend
on a clean, complete, correct database.
Resources
#11 and #12 are also important concerns and control time and budget
over-runs as much as the individual actions of the Petrophysical
Team.
2.09
Petrophysical Data Gathering for Integrated Projects
STEP
6: Define the Data Gathering Process
Petrophysical data gathering is usually done as part of a team
made up of personnel from several Phases, with a qualified log
analyst as a member of the team. Sometimes, data gathering and
inventory is done by a team from only one of the Phases. These
people must be aware of all the data needed for the entire project,
including petrophysics broad needs, not just those of their own
Phase. To minimize effort later, data gathering must be done thoroughly
and inventoried accurately.
If
data is known or suspected to exist, it must be pursued diligently
and persistently until all avenues are exhausted. If required
data is truly not available, the client should be notified of
the consequences immediately, along with a recommendation for
additional work required to overcome the deficiency. For petrophysics,
the missing data is often the electrical properties, petrographics,
minerology, water chemistry/salinity, and core porosity-permeability-grain
density data we need to calibrate the log analysis.
The
cooperation of the client in data gathering is critical. Data
that is overlooked or deliberately held back reduces the quality
of the results, to the detriment of the project and everyone involved
in it, including the client representatives. A copy of the data
inventories should be given to the client, with a request to review
and augment the database where possible.
A
complete list of data required for petrophysics is listed below.
Much of the data listed is needed by more than one Phase. However,
each Phase should prepare its own data gathering list, so that
all required data is properly itemized. The combined data gathering
list should be provided to the client before the data gathering
trip to acquaint them with our needs and expedite the gathering
process.
To
obtain optimum results, the petrophysical team requires all pertinent
well data in a timely manner. If some requested data is not available
or arrives late, it may not be possible to calibrate petrophysical
results adequately. In such cases, a discussion of the data deficiencies
will form part of the final report.
Crain’s Data Gathering Checklist
Project
Definition To Be Provided By Client
-
Names and titles of client's key personnel
-
Brief overview of petrophysical requirements and problems
-
List of pools to be analyzed, brief geological description,
brief production history, fluid types, water problems,
special considerations for each pool
-
List of wells, zones, and intervals to be analyzed
-
List of cored intervals, footage recovered, formations
encountered, interval analyzed, special core analysis
intervals, type of special analysis
-
List of logs available and intervals covered
-
List of XY coordinates and KB elevations, with base
map
-
List of log curves and intervals digitized by client
-
List of log curves and intervals to be digitized by
consultant
-
List of wells that require TVD correction
-
List of workovers in each well, with perf intervals,
date, test and IP results
-
List of formation tops in each well
-
Sample well logs and core data from a cored producing
zone
-
If project definition cannot be supplied by the client
we will do this work BEFORE a final proposal and budget
is made
Geology
Data To Be Provided By Client
-
Technical reports and papers on depositional environment,
structural geology, and petrography
-
Geological cross-sections and stratigraphic correlation
chart, formation descriptions
-
Structure map with well locations, faults, fluid contacts
-
Existing porosity, saturation, net pay, permeability,
pore volume, hydrocarbon pore volume, and flow capacity
maps
-
If cross-section and structure map do not exist, they
will be provided by Geological Phase BEFORE Petrophysical
Phase begins.
Petrophysical
Data To Be Provided By Client
-
Sample description (lithology) logs and mud logs
-
Core description
-
Conventional and special core analysis listings
-
Capillary pressure plots and listings
-
Electrical properties plots and listings (Formation
Factor, A, M, N)
-
Formation water chemistry analyses and resistivity
data
-
Formation temperature vs depth data.
-
Well logs - all porosity, lithology, resistivity,
and production logs, paper copies required
-
Deviation surveys or TVD listings
-
All above data on digital tape or disc, as well as
paper, where possible
-
Petrographic, thin section, SEM, and XRD data
-
Previous reports outlining net pay, water saturation,
porosity, net pay cutoffs, etc
-
Any permeability vs porosity transforms previously
used
-
Any A, M, N transforms and RW data previously used
Drilling/Completion/Testing
Data To Be Provided By Client
- Well ticket data
- Legal name and location
- Casing run, depths, type and weight, amount and
type of cement
- Spud and rig release dates
- Formation top names, and depths
- Perforated intervals, type, spacing, and dates
- Cored intervals, type, size, recovery and dates
- Oil analyses, gravity, and GOR
- Gas analyses, composition, and density
- Original and secondary oil/water, gas/oil contacts
- Completion and workover history
- DST tests, intervals, and results
- RFT tests, intervals, and results
- Perf tests, intervals and results
- Deliverability tests, eg: AOF (gas) and IPR (oil)
- Any special drilling problems: blow-outs, lost circulation
zones, stuck in hole, fractures, over pressure
- Treatment and stimulation history
- Production history plots, including monthly oil,
gas, water, and condensate production
- Injected volumes of gas and/or water used for disposal
or enhanced recovery
- List of accepted formation temperatures
|
|
STEP
7: Build a Clean Database
Preparation of the digital log database is usually the responsibility
of the Petrophysical Team. The requirements of other Phases of
the project must be made known at an early stage so that appropriate
curves and intervals are digitized for all potential uses. An
inventory of hardcopy logs, digitized curves, and intervals will
be maintained by Petrophysics.
If
other Phases prepare log digits for their own use, they should
coordinate their efforts with Petrophysics to minimize duplication.
The
digital log database must reside on one computer under the control
of the Petrophysical Team. This database is termed the Master
Petrophysical Database and cannot be removed or modified except
by authorization of the Petrophysical Manager. It will be backed
up on a weekly basis for safety, with a copy held off premises.
The
integrity of the Master Petrophysical Database is a critical function,
and is the responsibility of ALL petrophysical staff. Problems
or deficiencies in data or procedures should be reported immediately
to the Petrophysical Manager.
Copies
of the Master database may be distributed to other computers or
workstations. However, this data becomes the responsibility of
the users on those workstations. At least one copy of the data
should be in read-only files on the workstation so that users
cannot corrupt the files accidentally. Users may copy these files
to their own directories for their own use. If accidents occur,
the data can be revived from the read-only files.
If
a distributed copy is in use, it is the responsibility of the
user to request updates and to report problems to the Petrophysical
Manager. However, users have a responsibility to make every effort
FIRST to confirm and define the problem by comparing their data
with the read-only files and the hardcopy logs.
Log
data quality control will be undertaken by the Petrophysical Team
as the database is being prepared. If problems are identified
to be caused by inadequate in-house digitizing, further training
will be implemented. Service bureau digitizing will be rejected
if errors are not corrected quickly.
STEP
8 : Quality Control the Digital Database
Quality control will consist of the following procedures:
1.
If data is provided in digital form, load and print catalog of
all known data files and compare to data inventory. If data is
digitized in-house, proceed as detailed below.
2.
Plot raw data from top to bottom at 1:xxx scale.
3.
Inventory curves on data plot and depth interval covered by each
curve.
4.
Compare curves and intervals to inventory of open hole logs, and
itemize missing curves or intervals.
5.
Compare plotted curves to original logs, and list curves and intervals
that need to be redigitized.
6.
Initiate (re)digitizing requests.
7.
Replot and recheck new digits.
8.
Update data inventory sheets.
2.10
Petrophysical Data Processing
STEP
9: Execute the Petrophysical Plan
Petrophysical analysis will proceed on a pool by pool basis. The
method employed for most studies will involve the following steps,
which may vary depending on available data and project objectives.
1.
Gather and inventory available data, review well files, sample
descriptions, drilling history, drill stem and production tests,
completion and production history, and current status of each
well, based on information in the well history files provided
by the client.
2.
Review conventional and special core analysis data and core description
on the cored wells, and enter all data into database. View available
cores and describe fracture patterns and lithology. Initiate and
monitor further core analysis if required.
3.
Prepare core porosity vs core permeability, and vertical vs horizontal
permeability crossplots (by zone by well and by zone all wells)
and determine best fit equations for each zone. Revise transforms
after water saturation data has been calculated and calibrated
to capillary pressure data.
4.
Crossplot porosity vs formation factor and saturation vs resistivity
index from special core data, by zone by well, and by zone all
wells. Determine appropriate electrical properties (A, M, and
N) values from available special core studies, from modern EPT/MSFL
logs, and/or from Pickett plots if suitable water zones exist.
5.
Prepare log database and print inventory of available logs by
reading digital data (provided by the client) over required intervals,
digitizing any missing curves or logs according to accepted log
digitizing specifications. CHECK INVENTORY AGAINST HARD COPY LOG
HEADINGS.
The
curve complement will vary with the age of the logs, but will
include deep and shallow resistivity, sonic, neutron, density,
SP, gamma ray, photoelectric, and thermal decay time where available.
Additional curves will be added as needed and where available.
Old style neutron logs will be converted to a porosity scale.
All data will be decimated to 1 foot or 0.3 meter increment.
6.
Plot all raw data and core data vs depth. Compare to original
logs to verify scales, data quality, depth matching, and missing
data. THIS IS AN ABSOLUTELY ESSENTIAL QUALITY CONTROL STEP AND
MUST NOT BE OMITTED.
7.
Prepare initial log analysis and representative crossplots on
cored intervals on key wells with modern log suites to calibrate
porosity and permeability parameters, using the density-neutron-PE
shale corrected complex lithology three mineral model for both
shaly sands and carbonates. Shale volume will be determined from
SP, GR, and density neutron crossplot (some methods are not appropriate
in some zones). Only those crossplots that are necessary for choosing
parameters will be made, but not all will be presented to the
client.
8.
Select appropriate water resistivity and mud filtrate value for
each zone and select appropriate calculation method for original
reservoir and invaded zone water saturation.
9.
Determine effect of conductive non-clay minerals and adjust saturation
accordingly.
10.
Adjust parameters as required and calculate final log analysis
on cored wells, to obtain a good match to core data.
11.
Calculate log analysis on remaining wells with density-neutron-PE
data, but no core data.
12.
When no PE is available, a 2 mineral model will be used. For old
style neutron cases, lithology will be assumed using log analysis
on offset wells or sample description for control.
13.
Calculate log analysis using the shale corrected sonic log model
for wells with core and/or density neutron data, to calibrate
sonic parameters.
14.
Calculate log analysis on remaining wells which have only sonic
log data.
15.
Perform similar steps for wells with density only or neutron only,
calibrating to core or offset density neutron or sonic data.
16.
Demonstrate calibration of log analysis porosity to core porosity
using depth plots, crossplots, and/or regression analysis.
17.
For wells with ancient logs, determine approximate porosity from
porosity mapping of offset wells, to aid in determining net pay
in these wells.
18.
Determine secondary porosity, fracture location and fracture intensity
from all available methods.
19.
After a few of each log suite are analyzed, write preliminary
report and review preliminary results with client, geology team,
engineering team, and compare to geological cross sections and
zoning concepts, as well as reservoir engineering results.
20.
Revise any methods or parameters and analyze remaining wells.
21.
Prepare cross sections to include all wells and compare shale,
porosity, lithology, saturation, permeability, and fluid contacts
from well to well. Check for consistency, geological variations,
data errors, and analysis errors using Quality Control Checklist.
22.
Compare results to geological zoning and run final layer summaries.
23.
Calculate dated water saturation from thermal decay time log where
available, and compare to original water saturation from resistivity
logs.
24.
Determine and justify (if possible) shale, porosity, permeability,
and water saturation cutoffs by comparing log analysis results
to core data, production, and test data.
25.
Determine original and dated gas/oil and oil/water contacts to
define gross intervals, checking with production and test data,
properly adjusted for capillary pressure data and age of well.
26.
Correlate capillary pressure curves and log analysis saturations
over transition zones.
27.
Calculate and print average porosity, average saturation, pore
volume, hydrocarbon pore volume, flow capacity, and productivity
summaries for each layer in each zone for mapping of reservoir
properties.
28.
Prepare depth plots of raw data and answers for wells with any
useable log curves and results at scales of 1:200 and 1:500, for
correlation and mapping purposes, showing formation analysis results,
core analysis porosity and permeability (where available), flags
for bad hole, light hydrocarbons, and pay intervals, and other
requested curves.
29.
Annotate tops, tests, cores, perfs, and fluid contacts on depth
plots. Add annotation tail with this data, parameters used, and
pay zone summaries.
30.
Print detail listings of all requested results for all zones.
31.
Present copies of necessary crossplots for each zone, with discussion
and explanation.
32.
Write final report, documenting calculation methods, parameter
selection, results, and conclusions, and discuss results with
client.
33.
Prepare copies of IBM compatible data tapes or discs in LIS or
LAS format containing raw data and results.
34.
Provide copies of results to other Phases as required through
the duration of the project.
2.11
Quality Control of Analysis Results
STEP
10: Check the Petrophysical Results
Quality control of log analysis results derived from visual observations,
chart book methods, programmable calculators, or sophisticated
computer programs, require careful consideration of many factors,
such as:
1.
Sample description, including hydrocarbon shows, porosity indications,
fractures, lithology, and gas kicks.
2.
Hole mechanics, including size, shape, roughness, solution, caving,
casing, and mud type, weight and salinity.
3.
Drill stem test results, including recovery amount and type, flowing
pressures, formation pressure, and mechanical details.
4.
Core data, including porosity, permeability, grain density, lithology
description and saturation.
5.
Production data, including fluid type and amounts, and mechanical
details.
6.
Offset data, including log values, interpretation parameters,
results, and of course, all the above mentioned items on the offset
wells.
7.
The assumptions you made concerning interpretation parameters
and analysis methods.

FIGURE 2.06: Quality Control by Observation of Ground Truth
- Compare core porosity and permeability to log results, check
fluid contacts, tested and perfed intervals.
in
a good analysis, all these factors should corroborate each other.
If they do not, you are missing something or some of your data
is WRONG.
Review
Figure 2.07 to gain an understanding of the sequence of events
that connects raw data, analysis, and interpretation.

FIGURE 2.07: Data flow and thought process for petrophysical
analysis
Do
not believe every core, DST, or perf test. They may not be from
the zone they are supposed to be evaluating. Many
cores range from one to fifteen meters off depth compared to logs.
Since this can usually be identified by the core gamma ray log
or the shape of the porosity distribution, it can easily be cured.
However,
DST data does not have any method of correlation, and we must
presume the same frequency and amount of depth adjustment as core
data is needed. Therefore DST's are often off depth compared to
logs.
Perf
tests can be located correctly, because there is usually a correlation
log, but they may produce from elsewhere in the hole due to mechanical
problems, such as channels in the cement, holes in the casing,
tubing or liners, or bad bottom plugs.
Many
cased hole logs may be run to confirm or discount mechanical completion
problems.
A
usual requirement of a log analysis is that it matches core data.
Do not be overly concerned about this, but a reasonable match
is usually possible and expected. The amount of the depth error
may not be clearly discernable by observation of the porosity
curve. The core gamma would be needed to find the correct adjustment.
Variation of one or two percent porosity is common and acceptable,
with the core usually being high. In unconsolidated sands, the
core can be 5 - 10% porosity too high.
A
second requirement is that hydrocarbons be shown on the analysis
over the interval that tested hydrocarbon, and that water be shown
where the well produced water. This is not easy - and many zones
will show water or hydrocarbons where the DST or perf test does
not, especially in shaly sands. Many water tests are really producing
mud filtrate, so take care to distinguish this possibility.
A
good analysis is one that can be reconciled with the facts, without
involving mystical powers or miracles. Adjustments of analysis
parameters are generally needed if agreement is very poor.
Some
zones just do not look good on logs, yet produce prolific quantities
of oil or gas, such as the Viking in Central Alberta or the Austin
Chalk in the Gulf Coast of the USA.
Residual
hydrocarbon, bitumen, or pyrobitumen and heavy oil can cause many
zones to be apparently attractive on logs yet produce water, filtrate,
or nothing on drill stem tests. Try to identify this potential
problem from sample or core description or by moved hydrocarbon
analysis. A similar problem occurs in tight gas sands, where the
zone truly can produce gas, but the DST recovers mud filtrate
or formation water, but little gas.
The
most common error of all is accepting density log data in rough
or large hole - do not be fooled by this. Use the sonic or the
neutron log corrected for shale to see how valid the density log
data might be. DO NOT USE THE DENSITY LOG IF IT IS INCORRECT!!!
Experience
and common sense are the best quality control. Just because it’s
your play, do not make it look too good just because one log can
be used to document your case (and three others contradict it).
Whether
you do an analysis for yourself, your company, or for hire, the
following proviso should be understood by all parties involved:
"THE
WEASEL CLAUSE" |
| |
GENERAL
TERMS AND CONDITIONS |
| |
Any
interpretation of logs (whether made directly from
logs or by electronic data processing from actual
or digitized log data or electronically transmitted
log data or otherwise) or any recommendation based
on such interpretations are opinions based upon
inferences from electrical or other measurements
and empirical factors and assumptions, which inferences
are not necessarily infallible, and with respect
to which log analysts may differ. Accordingly, we
do not warrant the accuracy or correctness of any
such interpretation or recommendation. Under no
circumstances should any such interpretation or
recommendation be relied upon as the sole basis
for any production decision. We do not guarantee
results. We make no warranties either express or
implied. Under no circumstances shall we be liable
for consequential damages. |
|
Keep
in mind that most service companies use a clause similar to this
one and you should understand the implications of it before you
start any logging operation at a wellsite.
2.12
Is Petrophysics The Career For You?
Log analysts come in two flavours; specialists whose main job
is to review, analyze, and research logging methods and results,
and the casual log analyst, whose duties are chiefly geological,
geophysical, or engineering in nature, but who must use logs and
log analysis results in support of their primary functions.
In
either case, good communication skills and the ability to determine
the real problem or request from all the surrounding chaff is
necessary. The analyst must be able to form rational opinions
in the face of incomplete and contradictory information. Knowledge
of programmable calculators and computer programming is now essential.
The
specialist log analyst must understand what the end-user of the
analysis does with the data. The specialist exists as an advisor
or staff member in an operating organization. The specialist may
be a consultant hired for a specific task, such as well site log
analysis or a pool study, on a day-to-day basis. The specialist
is expected to know more about logs, logging tools, and analysis
methods than any one else in the organization.
The
casual log analyst cannot be casual about his or her knowledge
of logs, but may not use the information all day, every day. This
log analyst is usually in a line position in the organization,
as opposed to the staff function of the specialist, and performs
some function in support of exploration, development, or production
of oil and gas. This may include supervision of people who perform
log analysis as specialists, or other casual analysts.
A
career as a specialist should not be chosen lightly - it's hard
work, requires constant updating and re-training, and the patience
of a saint to survive. Attention to detail, as described in previous
sections of this chapter, can make the job boring. It may be a
"dead-end" job unless you are skilled at job hopping.
Casual users should recognize that their career can be enhanced
by knowledge of log analysis, but should also recognize the limits
of that knowledge and get expert advice when needed. Rem
|